METHOD STATEMENT FOR REPAIRING TOP SLAB



1.   INTRODUCTION & GENERAL INFORMATION
This method of statement is  made because on location of Topslab OH 54 there is a footmark. This method of statement provides the details of materials, equipment and sequence of work related to repairing Top Slab OH 54 .

2.   MATERIAL

Required material for concreting  work ie :
a.    SikaGrout 212

3.   EQUIPMENTS AND TOOLS

Required material for concreting  work ie:
a.    Small Equipment for Chiping Concrete
b.    Hammer
c.    Crane & Bucket


4.   EXECUTION METHOD

The concreting  work will be proceed as the follow (see attachment) :
a.    Preparation of small equipment.
b.    Chiping the footmark area  of Top Slab OH 54 Sec 8.1
c.    The surface must be clean before concreting
d.    Apply a bonding coat of 1part RHEOMIX® 121 diluted with 2 parts water
e.    Concreting of Footmark area using SikaGrout 212
f.     Screed the surface of concrete.


5.   ATTACHMENT

Attachment 1 :  Reparation Method
Attachment 2 :  Catalog SikaGrout 212.
Attachment 3 :  Catalog BASF Rheomix 121


Reparation Method

Catalog SIKAGROUT 212 SCELLEMENT





Catalog BASF RHEOMIX 121